mg021 re. STOIP, 1P reserves and importantly the sustainable production BOPD and decline curve I have my own guesstimate, but no more valid than anyone elses based on info released to date. The last estimate of recoverable reserves by RISC was was 0.5 - 4 MMBBL based on a static model with limited data, the presentation released on 08 March 2012 to ASX of P90 3 MMBBL to a mean of 4 MMBBL (Case1) seems on the low side when looking at latest interpretation of reservoir structure and volume - larger than the earlier volumetrics. When the report is finally released I would be surprised to see 1P come in lower than 2 MMBBL, maybe substantially higher but still guesswork until a field development program is actioned and the structure drilled up. Meantime I couldnt speculate, but wait on consultants report.
DISCLAIMER : No stock investment advice expressed or implied. DYOR
- Forums
- ASX - By Stock
- CTP
- how accurate is figure 1
how accurate is figure 1, page-21
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CTP (ASX) to my watchlist
|
|||||
Last
5.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $39.22M |
Open | High | Low | Value | Volume |
5.3¢ | 5.4¢ | 5.3¢ | $52.12K | 978.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 454057 | 5.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.4¢ | 46397 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 454057 | 0.053 |
1 | 10000 | 0.050 |
1 | 280000 | 0.049 |
1 | 1000000 | 0.048 |
1 | 136131 | 0.047 |
Price($) | Vol. | No. |
---|---|---|
0.054 | 46397 | 1 |
0.055 | 18545 | 1 |
0.056 | 102917 | 1 |
0.060 | 210909 | 3 |
0.067 | 10000 | 1 |
Last trade - 16.10pm 28/06/2024 (20 minute delay) ? |
Featured News
CTP (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online