As the lateral of SRH#5 has been reduced the fraccing costs should be reduced to $3.5M (maybe more). SRH#1&2 will require $200K each for the drip line to mitigate the parafin issue. Then we need to consider the above ground costs at #5 storage etc these are unknown.
When you look at this I struggle to see how they have the money in the kitty.