The Carynginia, the Lower Carynginia
(2890 – 2940m) and the Middle Carynginia (2824 – 2875m).
So 2x50 meter fracs, where did/do they get in there report it's coming from a 50 frac??
There where two fracs done on this zone they are to be flow backed together.as the plug was put in at the top of the IRCM.