STB 0.00% 40.0¢ south boulder mines ltd

paul's here, page-24

  1. 522 Posts.
    lightbulb Created with Sketch. 15
    Oops...







    If an excavator can load a 50m3 truck in 5 minutes, 12 trucks are required, to keep the digger @ 100% use plus hauling time, which would presumably be a 3 hour return trip per truck so that is a fleet of 36 trucks (I think...)...


    so, doing it 24/7 carrying 50m3 each arriving at port every 5 minutes? Delivering @ 50m3 per truck every 5 minutes?
    50m3x12 Trucks per hour =600 Tonne per hour, per digger.




    Thats 10 tonnes a minute..$40000


    Per Digger.


    Anyway...off 'sploring.


















 
watchlist Created with Sketch. Add STB (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.