RXM 0.00% 46.0¢ rex minerals limited

where is the bottom, page-26

  1. 420 Posts.
    lightbulb Created with Sketch. 52
    Dear Mr RooBoy, as per announcements, slurry pipeline has been included in the PFS as carried out by an infrastructure firm. the 12km long slurry pipeline which will deliver two types of concentrates. A washing and drying facility next to the port was also part of the study. These costs have been included in the CAPEX total.


    I suggest you read the PFS, which also talks about power & water supply. I highly doubt in these times that management would blatantly lie to their shareholders, as this would make them very much liable to legal troubles down the road if true.


    Oh & BTW, OZ minerals have added 'looking for value adding opportunities' back into their investor presentations. And it's no secret that they have been sniffing around for some time (maybe waiting for the confidence in a reserves statement too- tick).
 
watchlist Created with Sketch. Add RXM (ASX) to my watchlist
(20min delay)
Last
46.0¢
Change
0.000(0.00%)
Mkt cap ! $360.3M
Open High Low Value Volume
46.0¢ 46.5¢ 46.0¢ $1.004M 2.181M

Buyers (Bids)

No. Vol. Price($)
7 5243529 46.0¢
 

Sellers (Offers)

Price($) Vol. No.
46.5¢ 8605376 42
View Market Depth
Last trade - 16.10pm 09/09/2024 (20 minute delay) ?
RXM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.