ETR 0.00% 0.7¢ entyr limited

games, page-24

  1. 5,731 Posts.
    lightbulb Created with Sketch. 480
    I don't know when it will arrive dmasive. My estimate of couple of day to run that pump downhole and connect cable to power source is conservative I mean. It could be quicker than that just to install the pump for the 1000m deep well and I assume LAR rig and its personels are slow. It will then take a week or so to ramp up and fine tune production. So my conservative estimate is time arrival + 10 days to know production. S** happens in oil industry all the time, you may see how the actual operation is different to plan in many cases.
 
watchlist Created with Sketch. Add ETR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.