CAZ need to get up to speed on the WFE project. I noted the same mistake in their Brisbane Mining Conference presentation.
The Global WFE inferred resource estimate is 368Mt at 54.7% Fe. The main CID ore body commences 30m below surface with a inferred resource estimate of 343 Mt at 55.3% Fe.
This was released in August 2012.
- Forums
- ASX - By Stock
- WFE
- caz confirmation of 51% earn in for wfe
caz confirmation of 51% earn in for wfe, page-22
-
-
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)