who said it was a mine ??? it was an exploration area drilled 63 year ago :) now body is there
The company drilled its
first RC drilling program in September 2012. This RC drilling program was designed to test for extensions of
the previously reported high grade drill intercepts from the 1950’s.
A total of 31 holes were drilled for 4972m.