Cockatoo away to get their bond backs which leads me to believe the actual cost of environmental restoration is at least $20m in todays money.
........................................
By the time PLV is finished at Cockatoo I hope the restoration costs will be substantially more than $20 Million.
PLV will have to restore the new stage 4 area and hopefully the upcomoing stage 5 area and maybe the lower grade ore content area on the east side will be mined for benefication value. The more the merrier.
Looking good!
Add to My Watchlist
What is My Watchlist?