hi angusvery quiet on the NEO thread..perhaps they've gone underground with salty..anyway expect ann about gas contract within the next 2weeks me thinks..perhaps a linkup with the gas grid shortly thereafter.will be interesting on gas flows.will it be two wells connected or just one for starters..could be anything between 1-2mcf/d (stabilized flow rate).NEO's share 37.5%will they need to rattle the tin medium term..costly drilling coming up..regrds