By now we should have extracted the following ore.
Homer dump 71,000 tonne
Doze footwall 35,000 tonne
Stage 3 floor retreat 93,000 tonne
Mineralised waste 21,000 tonne
Ramp at stage 5 wall 50,000 tonne
Floor underneath old processing plant 15,000 tonne
Stage 4 scavenger pit 247,000 tonnes
219,000 tonnes of ore should have been extracted by end of 2012 and 313,000 in first quarter of 2013.
Let's blame those pesky cyclones of which at this time I can only think of 1. Cyclone "rusty" in late February.
I'm sure our resident meteorologist Super Tim has a list as long as your arm, althoug I think there was a second one called cyclone"convenient excuse"