re: Ann: Ferrotungsten metal first fill insta... I quote:
"Hazelwood is pleased to advise that the first fill of ferrotungsten metal has been installed into the furnace at the ATC Ferrotungsten Project. This significant tonnage of ferrotungsten metal will be retained in the furnace during operations to protect the furnace shell from the extreme temperatures associated with the production of the alloy".
In the photo on the left (in the announcement) the fill is behind the inner liner. The guy on the left of the group is standing on the fill.
- Forums
- ASX - By Stock
- HAZ
- Ann: Ferrotungsten metal first fill installed Pro
Ann: Ferrotungsten metal first fill installed Pro, page-7
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)