re: next two quarters figures Hi Ricky,
That report on Sedar is dated Mar 29, 2004 and titled Technical Report(s) - you're looking for Figure 1 on Pg16 of the 104pg download.
Just to summarise:
Period 1 Sep/Dec03
Period 2 Jan/Mar04
Period 3 Apr/Jun04
Period 4 Jul/Sep04, then we didn't dig ore for 6mnths.
Period 5 Apr/Jun05(4% ore)
Period 6 Jul/Sep05(5.5% ore)
Periods 7 to 10 Oct05/Sep06(7% ore),etc
Now periods 5 & 6 have been uncanningly accurate so lets hope periods 7 to 10 achieve the above levels.
Recovery rates are a product of the level of the ore grade fed to the plant, the higher the grade the higher the recovery rate & at a rate of 7% ore you should get the promised 92% recovery rate.
Sounds good doesn't it?
- Forums
- ASX - By Stock
- AVM
- smashing!!!!!
smashing!!!!!, page-8
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AVM (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.1¢ |
Change
0.001(5.00%) |
Mkt cap ! $3.538M |
Open | High | Low | Value | Volume |
2.1¢ | 2.1¢ | 2.1¢ | $4.83K | 230K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 233048 | 2.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.4¢ | 284924 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 233048 | 0.022 |
1 | 246845 | 0.021 |
5 | 389425 | 0.020 |
1 | 52630 | 0.019 |
1 | 166666 | 0.018 |
Price($) | Vol. | No. |
---|---|---|
0.024 | 284924 | 1 |
0.025 | 134038 | 3 |
0.026 | 406643 | 2 |
0.027 | 150750 | 2 |
0.028 | 470000 | 1 |
Last trade - 15.16pm 27/09/2024 (20 minute delay) ? |
Featured News
AVM (ASX) Chart |