SRH#1 and #2 have shown that the Cline is where the pressure is. SG stated that it was due to this pressue GGP have the issues in the upper levels and had to shut in these for more than 12mths.
It is a shame that the horizontal does't go through to the Cline as you would expect a bumper BOPD with the 4,500ft horizontal.