AVM 3.85% 2.5¢ advance metals limited

see presentation on web site - 2nd october

  1. 3,626 Posts.
    lightbulb Created with Sketch. 844
    Hi,

    The latest presentation at anvil's web site is quite a reading.

    - Resources and reserves will triple by year end (expected)
    - The 2006 output will be around 43000 tonnes
    - The 2007 output will be then 45000 tonnes of copper

    The vaerage cash cost (ex mine I gather) is around 45 c

    Looks like a lots of profit coming our way very soon

    70c, 80c and 1.00 will be history in about 6 to 8 months.
 
watchlist Created with Sketch. Add AVM (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.