    I would say as a minimum 3 months to prove up an inferred resource.

    400 metre to a hole would take at least 4 to 5 days depending on the rig, they may use a floating rig, these are usually more powerful so could be less.. could go deeper also.


    If they can use the previous drill results from BHP that can be seen in the December 12 presentation, that may reduce the time a bit.


    69.3% Fe..


    Cheers ..
 