002 is 450M downplunge from CP021 refer the initial ASX discovery announcment There have been a couple of discrepancies in what they have submitted they accidently used the numbering 020 instead of 002 which is a rather big mistake. There is no way to ascertain width of the corridors at the moment IMHO. By drilling parallel to strike it should make no difference to intercept width IMHO only the azimath change of the drill will effect drill width and if oblique drilled then questionable tactics being used. When ever a company says the word "believe" then that is a way out of a professional opinion IMHO.
OGX Price at posting:
22.2¢ Sentiment: None Disclosure: Held