ASL 2.61% $1.18 andean silver limited

another wait for the dfs, page-34

  1. 9,111 Posts.
    lightbulb Created with Sketch. 908

    Ambertine,

    The issues with DS tailings have existed well before Ramu, i suspect the reason why MGO management made this their base case and other infrastructure changes is it represented the best chance for a low grade project of being economic....so sure, it technically didnt require explanation but if you assumed the likely implications....anyway, i tried.


    FMG sure, for MMC youll need copper at 5-6 lb plus imo for a number of years. For what its worth projects without grade advantage in PNG and Indo highlands may need these kind of prices to bring in new production anyway.
 
watchlist Created with Sketch. Add ASL (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.