So..
since the last report on 20 March, in about 73 days we have drilled a total of 490 metres.
Then...
Drilling to 1,200 metres (another 112metres) should happen by about 28 June, 2013.
- Forums
- ASX - By Stock
- LKO
- yalloum power -1 well slow drill
yalloum power -1 well slow drill , page-43
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LKO (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.00 |
Change
0.000(0.00%) |
Mkt cap ! $58.8K |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
LKO (ASX) Chart |
Day chart unavailable