DRILLINGCOMPLETEDAT MOONBI GOLD TARGET IN S.A. INTERCEPTS SULPHIDES AND CHALLENGER STYLE HOST ROCKS WITH GOLD POTENTIAL
• 14 drill holes completed at Moonbi gold target, co-funded by SA Government PACE Initiative
• Sulphides indicative of Challenger-style gold potential intercepted in 8 holes
• Strong similarities observed in rocks intercepted to those at the nearby producing Challenger gold mine
Samples from both the Durkin Cu-Ni and Moonbi gold drilling have been submitted for assay with results
awaited. It is anticipated that Durkin results will be received shortly to be followed by assay results from the
recently completed Moonbi drilling.
- Forums
- ASX - By Stock
- MEU
- moonbi update
moonbi update
-
-
- There are more pages in this discussion • 31 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
GML
Gateway Mining sells WA Eastern Montague gold project to Brightstar for $14M – half of that in shares
TG1
TechGen Metals kicks off airborne geophys survey at Sally Downs copper play – a first for the permit
STX
Strike hands $48.5M contract to Clarke Energy to produce 20x 4.5MW gas engines for Sth Erregulla
Add MEU (ASX) to my watchlist
|
|||||
Last
4.1¢ |
Change
-0.002(4.65%) |
Mkt cap ! $44.54M |
Open | High | Low | Value | Volume |
4.1¢ | 4.1¢ | 4.0¢ | $64.13K | 1.579M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 315901 | 4.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.1¢ | 120172 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 305901 | 0.040 |
2 | 75640 | 0.039 |
2 | 120000 | 0.038 |
1 | 100000 | 0.037 |
1 | 205000 | 0.035 |
Price($) | Vol. | No. |
---|---|---|
0.041 | 120172 | 2 |
0.042 | 300000 | 1 |
0.043 | 18000 | 1 |
0.044 | 164994 | 2 |
0.045 | 215109 | 2 |
Last trade - 15.20pm 02/08/2024 (20 minute delay) ? |
Featured News
MEU (ASX) Chart |