SP8 0.00% 0.7¢ streamplay studio limited

float of allaqi gold assets, page-7

  1. 1,571 Posts.
    The other sad thing about that article was the 2007 timeline for commencement of production. It was 3rd-4th quarter 2006 last time in any ASX release. Now surely if the deadline has been changed this should be announced to the market....??
 
watchlist Created with Sketch. Add SP8 (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.