weekend lounge short term trading 14 -16 june, page-18

  1. J8
    14,771 Posts.
    lightbulb Created with Sketch. 863
    JKA's Tunisian well doesn't look good at this stage . There is a horizontal section being drilled to intersect the vertical fractures but so far there is no report of oil from the vertical drilling .
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.