I need to correct a previous post I made. Although I was unsure as to the conditions the IP number was given, I did presume it was done without the new Gas Lift systems in place.
That is incorrect so my apologies if I did mislead anyone here.
If people read the last P&D report, it states the report is up to the 15/6/ 2013. So the gas lift system was started 2 days prior to the IP test which unfortunately makes the figure even worse ????
That's my understanding.
GGP Price at posting:
5.0¢ Sentiment: None Disclosure: Not Held