MYG 2.44% 80.0¢ mayfield group holdings limited

we are supposed to forget the promises, page-11

  1. 878 Posts.
    lightbulb Created with Sketch. 2
    Just released to the market.

    Read further down on the financing package.


    MUTINY IN DISCUSSIONS ON DEVELOPMENT OF ROCKSTEADY DSO IRON PROJECT
    HIGHLIGHTS:
    ? Opportunity identified to commercialise historic iron ore assets
    ? Advanced negotiations underway with local iron producer on DSO shipments
    ? Potential to receive cash flow within next 6 to 8 months
    ? Iron earnings to help fund further development of Deflector and other Gullewa project opportunities
    ? New opportunities to enhance and advance the Deflector Gold-Copper Project identified
    Australian resources company Mutiny Gold Ltd (ASX: MYG)(“Mutiny” or the “Company”) is pleased to announce that it is currently in advanced discussions with a local producer to commercialise the iron ore assets contained in its Gullewa Project area, located within the Murchison Region of Western Australia. This strategy could potentially generate early cash flow for Mutiny within the next 6 to 8 months.
    Mutiny is also in detailed negotiations with a large mining contractor to form a potential partnership to develop the Rocksteady asset with the partner supplying mining equipment and start up funding.
    As previously announced by Mutiny, the Gullewa tenements contain significant iron mineralisation within numerous banded iron formation (“BIF”) units. These BIF units are interpreted to have a total length of approximately 150km. The BIF units are underexplored having been previously drilled for iron ore mineralisation at only two locations being the Rocksteady and Brandy Hill Prospects. At both of these prospects significant iron mineralisation was intersected. The BIF units are typical hematite similar to those found elsewhere in WA’s growing Mid-West iron region that are currently being mined.
    The development of the iron assets and their proximity to key infrastructure has been attractive to Mutiny since it acquired the Gullewa tenements in June 2010. The Project is strategically located approximately 50km from a railway, and 200km from the Port of Geraldton.
    Mutiny’s Managing Director, John Greeve, said the Company has always highlighted the mineral endowment contained within its Gullewa tenements and the variety of development opportunities they contain and maintained a strongly announced company objective of being a multi-mine operator.
    “A Rocksteady development has always been one of our key, early stage development options at Gullewa and right now a ‘window of opportunity’ has opened up for Mutiny and we intend taking
    28 June 2013
    Page 2
    advantage of it, with the very real potential for Mutiny to be earning cash from this development by
    early to mid 2014.
    “Rocksteady is located on an already granted Mining Lease and there is sufficient evidence to suggest
    that there is significant upside for adding substantial quantities of DSO quality Hematite. In this regard
    we have also entered into discussions to quickly begin a significant new drilling programme there,” Mr
    Greeve said.
    Mr Greeve described the proposed development as a win/win situation for Mutiny as it will:
    ? Allow the Company to be cash flow positive;
    ? Allow the Company to develop a valuable asset; and
    ? Allow it to continue to build the Deflector Gold-Copper Project into a company making asset.
    Deflector Gold-Copper Project
    Mutiny is also pleased to announce it has also identified a potential new strategy for developing our
    high-grade, low cost Deflector Gold-Copper Project.
    The strategy it is currently working on is to have the construction of the Deflector Gold-Copper
    processing plant partly funded by a leading mining services company and this would entail:
    ? The mining construction company carrying a large portion of the cost of constructing the
    Deflector Gold-Copper processing plant
    ? A separate mining services company being awarded the Deflector mining contract on the basis
    they provide equipment and funding required for the mine development
    “We have already entered into detailed discussions with a major mining construction company and a
    leading mine contractor. With the mining services sector enduring a significant slowdown in activity and
    beginning to lay off workers, Mutiny and our potential development and operational partners have
    identified an option that is a win/win opportunity for all,” Mr Greeve said.
    Deflector Finance Package
    Mutiny is also providing an update on discussions aimed at concluding a financing package for the
    Deflector Gold-Copper Project.
    The Company confirms that four significant banks were short-listed to potentially participate in a bank
    financing syndicate – and after significant due diligence - all four banks have provided initial approval for
    Deflector development funding. Mutiny had progressed to harmonising terms on a two bank Funding
    Deal and up until Wednesday 19th June, matters were progressing towards a successful conclusion for a
    funding package of circa $40m (plus $40m from Sandstorm).
    28 June 2013
    Page 3
    However, with gold and equity markets currently in a state of turmoil, the Company has elected to investigate other development funding opportunities.
    “It has become quite clear since the latest price fall that it is going to be very difficult in this current market to quickly conclude a financing package for Deflector which retains shareholder and project value. Several emerging producers have announced similar conclusions over the past few weeks,” Mr Greeve said.
    “While we, and our financial advisers, strongly believe that Deflector’s credentials put it at the leading edge for development proposals of its size in Australia, the fact is that for every step forward we have made in concluding a financing package, we have been pushed back just as much by market developments out of our control.
    “While we are continuing to maintain Deflector financing discussions with a number of banks, it will no longer be our sole focus for funding future developments.
    “Our key objective now is to be cash flow positive and to create shareholder value as rapidly as possible and the opportunities we have announced today is a clear outline of the strategy to achieve that outcome.”
    Figure 1 – Project Location Map
    28 June 2013
    Page 4
    Figure 2 – Gullewa Iron Projects Geological Map highlighting BIF Units
    Forward Looking Statements
    All statements other than statements of historical fact included in this announcement including, without limitation, statements regarding future plans and objectives of Mutiny Limited (Mutiny) are forward-looking statements. When used in this announcement, forward-looking statements can be identified by words such as ‘may’, ‘could’, ‘believes’, ‘estimates’, ‘targets’, ‘expects’ or ‘intends’ and other similar words that involve risks and uncertainties. These statements are based on an assessment of present economic and operating conditions, and on a number of assumptions regarding future events and actions that, as at the date of this announcement, are expected to take place. Such forward-looking statements are not guarantees of future performance and involve known and unknown risks, uncertainties, assumptions and other important factors, many of which are beyond the control of the company, its directors and management of Mutiny that could cause Mutiny’s actual results to differ materially from the results expressed or anticipated in these statements. The company cannot and does not give any assurance that the results, performance or achievements expressed or implied by the forward-looking statements contained in this announcement will actually occur and investors are cautioned not to place undue reliance on these forward-looking statements. Mutiny does not undertake to update or revise forward-looking statements, or to publish prospective financial information in the future, regardless of whether new information, future events or any other factors affect the information contained in this announcement, except where required by applicable law and stock exchange listing requirements.
    For further information, please contact:
    John Greeve David Tasker/Colin Hay
    Managing Director PPR Australia Pty Ltd
    Mutiny Gold Ltd Tel: +61 (0) 8 9338 0944
    Tel: +61 (0) 8 9368 2722
    Em: [email protected]
 
watchlist Created with Sketch. Add MYG (ASX) to my watchlist
(20min delay)
Last
80.0¢
Change
-0.020(2.44%)
Mkt cap ! $73.17M
Open High Low Value Volume
81.0¢ 81.0¢ 77.0¢ $7.061K 9.123K

Buyers (Bids)

No. Vol. Price($)
1 1298 77.0¢
 

Sellers (Offers)

Price($) Vol. No.
80.0¢ 2292 1
View Market Depth
Last trade - 15.19pm 15/11/2024 (20 minute delay) ?
MYG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.