Yeah matyd, we're the only rich ones who have gone all in on a rig lease for 18 months or so. Lol.
As far as the drill/frac "plan" for NS goes, I don't recall any time where it was mentioned that the fraccing would only be done after drilling was completed as a batch. That to me, is just an assumption (which is not hard to do with SSN) not a change in plan.
But it would never have made sense to wait as you would have costs sunk onto wells that are sitting idle/un-completed.
So far TB has been a master at dodging bullets.
we had committed to a rig lease without a use for it only to strike an interest swap with Zavanna and have somewhere to use it.
Starting a multi well drill programme without the capital funding only to raise some funds through a land sale after a semi failed RI.
For me, by now, I would assume Matson will start when the rig is released from its last location as it would have been utilised in-between.
Frontier 24 would be on the next hole and drilling as the last Ann had it at completed after running the drill string for Sail & anchors pumping operations. But that's all an assumption until confirmed. Lol.