All works will be completed by the end of this month, yes.
Very impressive this plant. It has been hell for so many reasons, Aussie has not had a plant like this before, but I am sure the media release will be pleasing to all. What goes out to the tailings dam is bugger all, we are all amazed. The secondary crusher is problematic, but a few tweaks here & there and in a few weeks everything will be running at full capacity. we have learnt a great deal to never look back and have these problems again.
We are not so much concentrating on what is going on here now, its down to production at full capacity in a few weeks. We could do with another couple of trains each day to get rid of what we are producing, not enough trains and not enough ships to get rid of this stuff. Quality is way above expectations.
Name plate is just a given thing for us now, as I have said, not concentrating on that now, it what is going to be happening in 6 months from now up the road.
New equipment coming, more staff, more expansion and more red wine.
Hope all is well.
- Forums
- ASX - By Stock
- GBG
- red dirt dan ??
red dirt dan ??, page-7
-
-
- There are more pages in this discussion • 95 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GBG (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online