Capital Outlay = FIT for 10yrs @ 12.5p/Unit = £16,425.00 + Inflation
Savings in Electricity if all the Electricity is used from the Bluegen= Approx £750.00 per yr
In the above case, no electricity would be exported but as regards PV, 50% of the generated electricity at 4.5p/Unit is paid anyway even if you do not export any. The reason being that no export meters are installed so therefore an estimate.
If it was the same for MCHP then £295 could be added to the £750.00