bit of good information i found in the december 10th 2010 release that i didnt know about the rail capacity GBG/Karrara have.
copy and pasted from the release.
"Some of the key areas where infrastructure has been upgraded include:
• An increase in the capacity of the high-voltage power line, from 132kv to 330kv, connecting Karara to the
State grid at Eneabba. This is sufficient to accommodate an ultimate production capacity of more than
36Mtpa;
• Improved rail haulage capacity of the 85km spur line connecting Karara to the existing rail line from
Morawa-to-Geraldton, increasing the capacity of the spur line to +36Mtpa. This line is being built as a dual
gauge to allow conversion from narrow to standard gauge in the future;"
so they can transport up to 36mtpa on the Rail. So at least they have future thought in mind and if MGI(in the future)share their berth/port access like someone mentioned somewhere on the forum yesterday then they could eventually haul in the $ with the High %FE
- Forums
- ASX - By Stock
- GBG
- sentiment
sentiment, page-10
-
- There are more pages in this discussion • 20 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)