Quick question of I may
During testing I presume they will do one fracture at a time, starting with the 1st encountered and allow (or pump) oil to flow to the surface and allow the flow rate to settle down. Then move to the next fracture.
But what do they do with the Crude at the surface, dump it into a barge or boat ?
Many thanks
- Forums
- ASX - By Stock
- JKA
- oil during testing ?
oil during testing ?
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)