Very good post DGH44. After having a look at pumps and pump flow rates I don't think it would take more than a few months to have it dewatered.
I am no expert but if a novice like me can find a pump like this in less than a minute I am sure Management will already have a plan for what they will be doing. I am sure there are pumps that are even more efficient and purpose built for mine dewatering.
http://www.ffti.com.au/flood-prevention/mobile-high-volume-flood-pumps/
And that is only with 1 pump running. The cost of that is nothing compared to the payday it paves the way for.
I really believe this is nothing to worry about and believe management see it as the same which is why it was not mentioned. It is still good to see that people here are trying to understand the project and doing the research.
Now we have to see if the sp is a slow and steady riser as news gets around or if Hectobar is on the money.
- Forums
- ASX - By Stock
- BMB
- Ann: Balamara Inside Briefing
Ann: Balamara Inside Briefing , page-46
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)