re: Ann: Cu grades at depth - 10m @ 7.3% Cu i... G'day Charlie123
You say "Looking at the photo the concrete slab on top of the ROM pad is done and dusted ......"
Hate to be pickie, but from the photo we still have a few more lifts of precast concrete panels (Reinforced Earth) to go before ore trucks can access the hopper, there is quite a bit of hand work involved in the construction of a Reinforced Earth retaining wall
What does please me is to see a lighting plant off to the right which could indicate there is some emphasis (may be a night shift) being placed on the completion of the ROM pad in readiness to supply feed to the crushing circuit
Be patent, SAFETY comes first on these projects
- Forums
- ASX - By Stock
- CDU
- Ann: Cu grades at depth - 10m @ 7.3% Cu in massiv
Ann: Cu grades at depth - 10m @ 7.3% Cu in massiv, page-8
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)