So on the 9/7/13 Arrowsmith update, there was no mention that had anything to do with the C layer.
move on to the 29/7/13 we get an ann to say we where indeed testing the C layer??
This copied from last ann.
A short duration flow test of 8 days was subsequently carried out on the Carynginia Formation over the period 4th-13th July.
.
- Forums
- ASX - By Stock
- NWE
- ann out
ann out, page-2
-
- There are more pages in this discussion • 47 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)