The quarterly has given us some indication of what may have caused the dam failure. Statement below taken from the quarterly when talking about the new temporary dam:
"The facility is proposed to be lined with a
plastic liner to avoid the potential for saturation of the underlying foundation and or the embankment, which may have been a causal contributing factor behind the TSF 4 failure."
If this is the case would that be the responsibility of the dam designer?
There is still some chance of insurance compensation and/or compensation from the dam design company.
Not sure if everyone is already aware of this but I have been advised by RED5 that all directors will be subscribing to their full entitlement.
- Forums
- ASX - By Stock
- VAU
- ann out rights issue to recommence prod
ann out rights issue to recommence prod , page-146
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add VAU (ASX) to my watchlist
(20min delay)
|
|||||
Last
37.0¢ |
Change
-0.005(1.33%) |
Mkt cap ! $2.516B |
Open | High | Low | Value | Volume |
37.0¢ | 37.5¢ | 36.0¢ | $8.665M | 23.58M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 418273 | 37.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
37.5¢ | 611282 | 24 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 204000 | 0.370 |
3 | 796178 | 0.365 |
23 | 1101542 | 0.360 |
9 | 770255 | 0.355 |
17 | 1178500 | 0.350 |
Price($) | Vol. | No. |
---|---|---|
0.375 | 489438 | 18 |
0.380 | 927711 | 22 |
0.385 | 882461 | 12 |
0.390 | 263239 | 7 |
0.395 | 503014 | 8 |
Last trade - 16.10pm 18/10/2024 (20 minute delay) ? |
Featured News
VAU (ASX) Chart |