GBG 0.00% 2.9¢ gindalbie metals ltd

Ann: First Premium Quality 68% Fe Magnetite Conce, page-2

  1. 2,266 Posts.
    lightbulb Created with Sketch. 42
    re: Ann: First Premium Quality 68% Fe Magneti... ? Karara Concentrator successfully produces batches of premium quality magnetite concentrate
    grading 68% Fe for the first time, marking a major milestone for the Project.
    ? Polishing circuit completed and commissioning underway, representing the final component of the plant to be brought on-line. Previously flagged filtering issue with the tailings system now fully rectified.

    ? Ramp-up towards nameplate 8Mtpa throughput capacity well advanced, with most key areas of the plant having operated for periods at this production level.

    ? Focus now on aligning and fully integrating all operating components of the Karara Concentrator to achieve consistent and reliable steady-state production. This is anticipated to occur in the December Quarter.

    ? Shipments continuing with 80 completed to date for 4.8 million tonnes since start-up in October 2012, comprising 3.5Mt of DSO and 1.3Mt of magnetite concentrate.