Gday Bsumisu a few key points need to be addressed with your question.
Firstly we are mining three products at the same time, which naturally will afford you lower cut off points and secondly the uranium and zinc will be by products in the production process as opposed to dedicated uranium mines so naturally you can afford to have a much lower cut off point with your uranium and zinc grades in comparisson to dedicated uranium mines or zinc mines.
And with bulk tonnage mines such as this one your cut of points will always be much lower eg like the big copper mines in Chile. I suppose a similar comparrison would be Olympic Dam in South Australia. Olympic Dam is a multi element deposit like Kvanefjeld. Both deposits are massive, both deposits are bulk tonnage and both deposits have a 50+ year mine life. Also Olympic Dam is the single biggest uranium deposit in the world, though uranium represents only a minority of the mine's total revenue. So with Olympic Dam with my case in point I imagine there uranium cut off point is very low just like Kvanefjeld.
- Forums
- ASX - By Stock
- ETM
- something to keep an eye on
ETM
energy transition minerals ltd
Add to My Watchlist
2.13%
!
4.8¢

something to keep an eye on, page-30
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
4.8¢ |
Change
0.001(2.13%) |
Mkt cap ! $74.46M |
Open | High | Low | Value | Volume |
4.7¢ | 4.8¢ | 4.5¢ | $56.21K | 1.211M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 603545 | 4.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.8¢ | 407911 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 593545 | 0.046 |
6 | 749640 | 0.045 |
3 | 313636 | 0.044 |
1 | 40 | 0.043 |
2 | 60000 | 0.042 |
Price($) | Vol. | No. |
---|---|---|
0.048 | 407911 | 2 |
0.051 | 90000 | 1 |
0.053 | 100000 | 1 |
0.054 | 200000 | 1 |
0.056 | 50000 | 1 |
Last trade - 16.11pm 11/07/2025 (20 minute delay) ? |
Featured News
ETM (ASX) Chart |
The Watchlist
VMM
VIRIDIS MINING AND MINERALS LIMITED
Rafael Moreno, CEO
Rafael Moreno
CEO
SPONSORED BY The Market Online