Remember that the production rate is constrained at the start by NSW EPA until they prove emission levels.
Initial iron production is pegged at 10,000 tpa (design = 18,000tpa iron chips)
Initial acid production is pegged at 650 tpa (design = 18,000 tpa HCl).
This will limit revenue until approval is received from the EPA.