IBG 0.00% 0.3¢ ironbark zinc ltd

ev $1.46 per share !!!, page-32

  1. 37,911 Posts.
    lightbulb Created with Sketch. 828
    amazing watching folks get sucked into this

    on 29 April 2013, IBG released a very complex to read Feasibility Study

    it appears the outcomes were based on zinc price of $1.31/lb (although currently the zinc price is $0.85/lb)

    page 14 states: "WM expects to see zinc average US$1.31/lb (US$2,897/t) for the five years from 2013 to 2017 in real terms and average US$1.37/lb (US$3020) for the life of mine in real terms."

    about opex, page 1 states: "Operating Cost US$0.68/lb Zn (Payable, Net of by-product credits, Years 1-5, Smelter fees additional US$0.22/lb Zn)"

    the smelter costs here are 17% of the zinc price

    so, at current prices, the opex is 68 + 14 = 82 cent/lb

    the project, currently, is basically uneconomic

 
watchlist Created with Sketch. Add IBG (ASX) to my watchlist
(20min delay)
Last
0.3¢
Change
0.000(0.00%)
Mkt cap ! $4.231M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
23 28594987 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 2799186 4
View Market Depth
Last trade - 10.04am 21/08/2024 (20 minute delay) ?
IBG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.