re: Ann: Atrum Coal Secures Port Capacity for... You are 100% correct, and this is calculated to conservatively yield AUD325 million p.a. at full production under the scoping study's metrics
The PFS due in a matter of weeks will include all other 2013 drill work and additional seam analysis and still only account for a small % of Groundhog's actual ground
It also discounts all other BC land holdings at zero
As such, it would appear logical that the only outcome for the PFS would be to upgrade Groundhog's margin returns from the scoping study
All this from a forecast AUD$60 million capex that will be fully funded by offtake and bank finance
ie NO equity dilution
If there was a take over target on the ASX bourse it cant be much better than ATU IMO
- Forums
- ASX - By Stock
- ATU
- Ann: Atrum Coal Secures Port Capacity for 1.5Bt G
Ann: Atrum Coal Secures Port Capacity for 1.5Bt G, page-60
-
- There are more pages in this discussion • 30 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ATU (ASX) to my watchlist
|
|||||
Last
0.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $13.22M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
ATU (ASX) Chart |
Day chart unavailable
The Watchlist
MTL
MANTLE MINERALS LIMITED
Nick Poll, Executive Director
Nick Poll
Executive Director
SPONSORED BY The Market Online