Kiwi, I think there is a misunderstanding on what I am asking. In your post no. 9684708, the most scary thing is the expenditures you mention here.
`There are a number of economic concerns.
Firstly is the cost. Even if they start with a simple open cut operation. The table on costs on pg 30 puts the mining surface infrastructure alone at $352m.
Power supply alone is listed at $166m
site development $12m.
Discard and slurry $53m etc.
And that's not even the mine which is listed at $714m.'
I believe these numbers are in Rands and if that is true, then the figures as written are about 10 times the actual figure. See if this makes any sense.
- Forums
- ASX - By Stock
- CCC
- report
report, page-23
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)