JKA 0.00% 0.3¢ jacka resources limited

loan facility, page-12

  1. 2,749 Posts.
    lightbulb Created with Sketch. 108
    The bit that worries me is the word potential in the comments below

    "The planned test operations include: clean up flow, potential acid stimulation of the reservoir, main flow period and pressure build up period. These activities are expected to take 5-8 days."

    Are they not confident they can run the tubing given the constant blockages ?
 
watchlist Created with Sketch. Add JKA (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.