the thing that I found interesting from their report was
"The plant achieved its highest throughput since early 2011 and its third highest quarter of throughput to date with 2.48 million tonnes processed (23 percent above nameplate capacity). "
23% above nameplate capacity, that is a significant increase & if you were to apply that to the CDU plant capacity it would make a significant difference, especially given the difference between the waste to ore ratios of OZL & CDU & the possible higher grade at CDU.
In the scheme of things, we really only have another 6-7 months before we should start to see the commissioning of the plant. I feel as if we are at last on the down hill slope.
Cheers
cj
CDU Price at posting:
$1.90 Sentiment: Buy Disclosure: Held