I read somewhere in the last few days that Cua Lo-1 was expected to take 42 days to drill. OK, two typhoons, a breakdown with the BOP and a sidetrack haven't helped, but surely, if as timber points out, a HP/HT well was drilled a mere 25km away, ENI would have been prepared for a challenging drill....