CDU 0.00% 23.5¢ cudeco limited

jorc code, page-26

  1. 2,755 Posts.
    Hoots

    "I wonder if CDU will release a maiden ore reserve"

    Apparently according to the JORC you cant have an ore reserve without first having a Feasibility study.

    "However attention is drawn to the requirement for a Pre-Feasibility Study or a Feasibility study to have been completed for the Public Reporting of an Ore Reserve in Clause 29. An Ore Reserve must not be reported based on the completion of a Scoping Study."

    Now here's the funny part, because they havent done a feasibilty study they havent demonstrated that extraction is justified so I guess all that ore they have stock piled they best put back because they cant prove its possible to justify the extraction when current mining activities are @ $1.90 per tonne I do believe.

    "An ‘Ore Reserve’ is the economically mineable part of a Measured and/or Indicated Mineral Resource. It includes diluting materials and allowances for losses, which may occur when the material is mined or extracted and is defined by studies at Pre-Feasibility or Feasibility level as appropriate that include application of Modifying Factors. Such studies demonstrate that, at the time of reporting, extraction could reasonably be justified."

 
watchlist Created with Sketch. Add CDU (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.