Good positive announcement.
They increased frac stages from 11-13.(interesting)
At around 10000 bls of fluid per week,produced by the jet pump,it maybe 3-4 weeks before we see first oil,if 50% of frac fluids need to be produced first.
Now all we need is an announcement stating,"flow rate is resticted to 1500bls oil per day, due to the capacity of the jet pump".
Best of luck to all.
- Forums
- ASX - By Stock
- TPD
- Ann: Bonner 1H Fraccing Successful
Ann: Bonner 1H Fraccing Successful , page-4
-
- There are more pages in this discussion • 20 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)