Results. I wonder what will follow first.
Late in the Quarter,clusters of wide-diameter RC holes were drilled near CDH33 and CDH44 at Se251
(Figure 2).These holes were drilled to get more material for processing and to provide a representative
sample.This material is being bagged and trucked to Lucapa’s EXSISTING DMS plant for processing.
Processing of the BLK_13 sample is ON GOING. To date,11 diamonds weighing 13.45cthave been recovered
from 114m3 of gravel processed. At least three of the diamonds recovered from BL K _13 have been
confirmed as high-value Type2A gems.
Or Blk 18.
Exciting times ahead
Its roughly about 2km to the X-Ray Machine so I hope the roads are holding up.. ( Maybe we will have to invest in another).
The turning point has begun make or break time.
- Forums
- ASX - By Stock
- LOM
- new diamond plant is operational
new diamond plant is operational, page-3
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LOM (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $10.44M |
Open | High | Low | Value | Volume |
3.6¢ | 3.6¢ | 3.6¢ | $79 | 2.195K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 314999 | 3.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.0¢ | 58721 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 314999 | 0.036 |
3 | 420546 | 0.035 |
1 | 85000 | 0.034 |
1 | 210000 | 0.033 |
1 | 10000 | 0.032 |
Price($) | Vol. | No. |
---|---|---|
0.040 | 58721 | 2 |
0.045 | 139055 | 1 |
0.046 | 150000 | 1 |
0.053 | 100000 | 1 |
0.055 | 30000 | 1 |
Last trade - 10.04am 13/09/2024 (20 minute delay) ? |
Featured News
LOM (ASX) Chart |