OEL 8.33% 1.3¢ otto energy limited

great news, page-25

  1. 9,040 Posts.
    lightbulb Created with Sketch. 554
    As previously stated (before the sp dropped from 11 c to 8c) I will wait for the rig to be booked before jumping on for SC55 drilling.

    Usual lead time from booking the rig to drilling an offshore well is 6 to 18 months.
    Going by the sp, the market realises this.

    If OEL sole risk it, I doubt there'll be much of a pre spud run in the sp, given the destruction to OEL's balance sheet if its a duster, and what the lack of the farminee implies wrt SC55's prospectivity.

    No hurry to get on imo.
 
watchlist Created with Sketch. Add OEL (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.