As previously stated (before the sp dropped from 11 c to 8c) I will wait for the rig to be booked before jumping on for SC55 drilling.
Usual lead time from booking the rig to drilling an offshore well is 6 to 18 months.
Going by the sp, the market realises this.
If OEL sole risk it, I doubt there'll be much of a pre spud run in the sp, given the destruction to OEL's balance sheet if its a duster, and what the lack of the farminee implies wrt SC55's prospectivity.
No hurry to get on imo.
- Forums
- ASX - By Stock
- OEL
- great news
great news, page-25
-
- There are more pages in this discussion • 32 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add OEL (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.3¢ |
Change
0.001(8.33%) |
Mkt cap ! $62.33M |
Open | High | Low | Value | Volume |
1.2¢ | 1.3¢ | 1.2¢ | $25.58K | 2.105M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
13 | 8301793 | 1.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.3¢ | 17534369 | 14 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
13 | 8301793 | 0.012 |
10 | 8872816 | 0.011 |
6 | 14157452 | 0.010 |
2 | 1375122 | 0.008 |
2 | 166837 | 0.006 |
Price($) | Vol. | No. |
---|---|---|
0.013 | 17534369 | 14 |
0.014 | 4299235 | 9 |
0.015 | 4427000 | 7 |
0.016 | 2000000 | 1 |
0.017 | 72000 | 1 |
Last trade - 16.10pm 30/09/2024 (20 minute delay) ? |
Featured News
OEL (ASX) Chart |