Oz,
The last quarterly talks about 300,000 tonnes that is in the ore stockpile.
The highest grade stuff is something like 15% but its a small amount. The largest amount is some 200,000 tonnes thats most likely at about 1%.
The average for the whole pile so far is in the range 2-3% in my estimation.
Out of 300,000 tonnes of ore talked about in the quarterly, just 3100 tonnes is 12-15%. its quite a small amount that doesn't do a lot for the average.
- Forums
- ASX - By Stock
- CDU
- total revenue for rocklands $us17.8 billion
total revenue for rocklands $us17.8 billion, page-95
-
- There are more pages in this discussion • 43 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)