22/11/13
The Harold Lee 500 drilling rig is being mobilized to location and will be drilling ahead towards
initial reservoir targets in next few days
? Drilling schedule for Atzam #5 is 40 days to total depth target of 4,100 feet..
IMO it depends how long it takes to set up the Rig so its ready to drill.
- Forums
- ASX - By Stock
- ETR
- million dollar spud
million dollar spud, page-48
Featured News
Add ETR (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $13.88M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
ETR (ASX) Chart |
Day chart unavailable