-
Share
6,809 Posts.
3828
05/01/14
19:36
Share
GB,
Their wireline logs, pressure data, alongwith real time gas & cuttings records r sufficient to warrant a test interval.
Not sure if ENI ran a side wall coring tool, as the SWC bullets gives a physical sample of the reservoir they r planning to test.
We wont know if its 'commercial' until the well flows xx mmcfd of low CO2 gas but they r on track, as announced.
1 well simply derisks this resource/prospect, a followup appraisal well needs 2b drilled to commercialise the field in time.
cheers
-