Thank you Akeen,
The poster on the other site appears to have a bit in common with 'our' Tshirt, lol.
These statements made a lot of sense to me,
"It appears the Cua-Lo well could be a producer in its own right so its not just about testing this well but completing it as a production well.
The main contributor to time has been engineering design to cope with the production completion and the fact the HP/HT zone that caused the blowout has required extra care when casing and perforating."
Could one of our excellent technical posters please explain the ins & outs of this well not being abandoned, but rather becoming a production well, ie how this is physically achieved, timelines etc.
Thank you in advance.
Add to My Watchlist
What is My Watchlist?